Widely use factory direct galvanized spcc iron sheet coil price dx51d z200 galvanized steel coil
Product Name | Widely use factory direct galvanized spcc iron sheet coil price dx51d z200 galvanized steel coil |
10#, 20#, 45#, 16Mn, A53(A,B), Q235, Q345, Q195, Q215, St37, St42, St37-2, St35.4, St52.4, ST35 | |
Size | 6MM |
Width | 600MM~1500MM |
Zinc Coating | 40-600g/m2 |
Length | Length:Single random length/Double random length 5m-14m,5.8m,6m,10m-12m,12m or as customer's actual reques |
API 5L, ASTM A53-2007, ASTM A671-2006, ASTM A252-1998, ASTM A450-1996, ASME B36.10M-2004, ASTM A523-1996, BS 1387, BS EN10296, BS 6323, BS 6363, BS EN10219, GB/T 3091-2001, GB/T 13793-1992, GB/T9711 | |
10#-45#, 16Mn, A53-A369, Q195-Q345, ST35-ST52 Grade A, Grade B, Grade C | |
Section Shape | Square, Rectangular, Round, |
Technique | 6mm Thick Galvanized Steel Sheet Metal |
Packing | Bundle, or with all kinds of colors PVC or as your requirements |
Pipe Ends | Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc. |
MOQ | 1 Tons, more quantity price will be lower |
1. Galvanized 2. PVC,Black and color painting 3. Transparent oil,anti-rust oil 4. According to clients requirement | |
Product Application | 1. Fence, greenhouse, door pipe,greenhouse 2. Low pressure liquid, water, gas, oil, line pipe 3. For both indoor and outdoor the building construction 4. Widely used in scaffolding construction which is much cheaper and convenient |
Origin | Tianjin China |
Certificates | API ISO9001-2008,SGS.BV |
Delivery Time | Usually within 10-45 days after receipt of advance payment |
Q1: Wonder if you accept small orders?
A1: Do not worry. Feel free to contact us.
Q2: Can you send products to my country?
A2: Sure, we can. If you do not have your own ship forwarder, we can help you.
Q3: Can you do OEM for me?
A3: We accept all OEM orders, just contact us and give me your spec.
Q4: What's your payment terms ?
A4: By T/T,LC AT SIGHT,30% deposit in advance, balance 70% before shipment.
Q5: How long is your production lead time?
A5:It depends on product and order qty. Normally, it takes us 7 days for an order with MOQ qty.
Q6: When can I get the quotation ?
A7: We will quote you within 24 hours after we get your inquiry.